On Site Coil Replacement, Midlands

Service & Retrofit

On Site Coil Replacement, Midlands

Midlands

A 7.2m rooftop dry air cooler rebuilt in situ — nearly 5000 brazed joints, assembled through a 2.5m lift.

Overview

Coolers and Condensers Ltd were asked to replace a dry air cooler on the roof of an internationally renowned teaching hospital, but there were a few challenges to overcome. The original unit was put in some 25 years ago on the roof of a 7-storey building. Over time additional buildings were erected around it which meant it was impossible to crane a new unit onto the roof, and air lifting a new unit was out of the question. It was impossible to re-position the unit elsewhere, so a re-build was the only option. The unit was 7.2 metres long but the only way to get it to the roof was in a 2.5m deep lift. In the end we designed multiple coil blocks to fit within the lift which were then assembled and brazed together. There were almost 5000 brazed joints on the unit, all done when the coils were in position. Once fully brazed and tested the casework was replaced and new panels added where required. The headers were re-connected and the unit ran as when it was new. The complete project took around five weeks on site.

Key facts

Location

Midlands

Unit length

7.2m

Brazed joints

~5000

Duration

5 weeks on site

Get in touch

Have a project

like this one?

Send us the duty, a drawing or a photo of what’s on site. We’ll design the unit around it.